TSX-V: PSR
Polar Star Mining
Production and
Exploration in Chile
Acquisition and development of advanced stage gold, copper gold, and uranium exploration and production properties in Chile.



Market Cap:0
Share Price:
Shares O/S:59,286,241
F/D:78,615,961
as of:17-Feb-09

Industry:mining
LastFin'cng:Feb-09
President/CFO:Adam Rochacewich
IR Contact:David Speck


Profile  |  News  |  Charts  |  Media Room  |  Operations  |  People  |  Financial  |  Contact  |  Forum  |  Gallery


Polar Star Mining Corporation-Drilling Begins at Montezuma

TORONTO, ONTARIO--(Marketwire - Feb. 27, 2009) - Polar Star Mining Corporation (TSX VENTURE: PSR.V)("Polar Star" or the "Company") is pleased to announce that a reverse circulation (RC) drilling program of an initial 4,000 - 5,000 metres commenced February 26, 2009 on its 43,200 hectare Montezuma Project, Sierra Limon Verde District, Region II, Chile. Quantec Geoscience, Santiago, Chile also initiated a second Induced Polarisation survey to expand upon and infill their 2008 survey.

Highlights

- Old workings, leached and oxide copper bearing outcrops, geological and geochemical surveys define a highly prospective belt 5-8 kilometres wide by 30 kilometres long centred on the West Fissure Fault System.

- A large Chargeability/Resistivity anomaly 1.0 to 4.2 kilometres wide, 25.2 kilometres long, extending to depths of at least 300 to 500 metres has been identified by the Quantec IP surveys within this belt, along with several other 2-4 kilometre long satellite anomalies.

- A 4000-5000 metre, 16-20 hole reconnaissance RC drill program has been initiated to test hot spots within this anomaly.

- The length of the main IP anomaly is more than sufficient to include all the known Chuquicamata porphyry copper deposits.

- The property consists of 43,200 hectares, and is located 30 kilometres due south of CODELCO's Chuquicamata Mine and Smelter Complex.

- Montezuma covers 25 km of the West Fissure Fault System and associated splays, which hosts many large porphyry copper deposits including Chuquicamata and Escondida.

The Montezuma Project

The Montezuma Project consists of a contiguous group of 100% owned exploration concessions staked by Polar Star. As noted above, the West Fissure Fault System is well known for the exceptional size of its deposits. The Chilean Mine Handbook reported that in 2007 the BHP/RTZ owned Escondida Mine produced 1.5 million tonnes of copper and had copper reserves of 4.3 billion tonnes at an average grade of 0.81% Cu. The Corporacion Nacional del Cobre's ("CODELCO") El Norte Division, which includes Chuquicamata, reported production of 0.9 million tonnes of copper, reserves of 2.3 billion tonnes and an average grade of 0.79% Cu during the same period.

The Montezuma Project is located in the Sierra Limon Verde oxide copper mining district and is readily accessible by paved and good gravel road from the city of Calama, 20 kilometers to the north. The project consists of three groups of exploration concessions; Montezuma, Topater and Limonal totaling 43,200 hectares staked and owned 100% by Polar Star.

The Property lies within the central sub-zone of the main Chilean porphyry belt and covers approximately 25 kilometres of strike of the West Fissure Fault System and associated sub-parallel and NW-SE cross-cutting ancillary faults. The hills of Sierra Limon Verde which cover the Limonal, north and west half of the Montezuma claims generally expose the same group of metamorphosed Paleozoic intrusive, volcanic and sedimentary rocks that host the Chuquicamata porphyry copper deposits. The rest of the Montezuma claims and most of the adjacent Topater claims are covered by pediment gravels derived from the local hills.

Polar's geological and geochemical surveys to date have identified several large areas of leached, hematite stained and sulphate rich caps containing minor amounts of copper wad and chrysocola developed along and lateral to the West Fissure Fault System where it strikes through the northern claims of the Montezuma group and within the Topater group, quartz-tourmaline-copper-gold veins and stockworks of the type commonly found peripheral to porphyry systems. In addition, on several of the IP lines, 1-2 metre deep pits dug for electrodes uncovered disseminated copper minerals in porphyritic intrusive rocks.

There are no public records of mining or exploration activity in the property area. There are however three groups of old drill holes reportedly drilled by Codelco in the central and southern part of the Montezuma property along the projection of the West Fissure Fault System. Cuttings from a number of these holes show propylitic to phyllic alteration assemblages containing disseminated and veinlet pyrite plus minor chalcopyrite and bornite.

The reconnaissance IP survey completed by Quantec Geoscience, Santiago, Chile in 2008 concentrated along a NNE trending belt some 6-9 kilometres wide covering the trace of the West Fissure Fault System and adjacent N-NNE trending splays and cross faults and detected several anomalies. The main anomaly, which is entirely covered either by a sulphate cap or pediment gravels has been expanded by the currently running phase II infill survey to 1.0 - 4.2 kilometres wide, 25.2 kilometres long and extends to depths of at least 300-500 metres. The central sector of the anomaly straddles the West Fault but to the north and south it appears to be controlled by NNE trending splay and cross faults. By comparison the length of this main anomaly is more than sufficient to include all the known Chuquicamata porphyry copper deposits from Radomiro Tomic to Toki.

To view a map of the Montezuma Project, please visit the link below:

http://media3.marketwire.com/docs/PSR0227.pdf

Qualified Person

The drill program will be carried out under the direction of Mr. Terence Walker, M.Sc., P.Geo., qualified person within the meaning of National Instrument 43-101. Mr. Walker has reviewed the contents of this news release.

About Polar Star Mining Corporation

Polar Star Mining Corporation was created to acquire advanced stage exploration properties focusing on gold, copper-gold and uranium. The geographic focus of Polar Star is Chile, where the company has approximately 146,112 hectares covering 20 properties.

Forward-Looking Statements

The statements made in this news release may contain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from the Company's expectations and projections. Accordingly, readers should not place undue reliance on forward-looking statements. For a more detailed discussion of such risks and other factors, refer to Polar Star Mining Corporation's filings with Canadian securities regulators available on www.sedar.com or the Company's website at www.polarstarmining.com.

Share Capitalization:

Shares outstanding: 59,286,241 as at February 27, 2009.

The Toronto Stock Exchange Venture has not reviewed and does not accept responsibility for the adequacy or accuracy of this release and the information contained herein.


Contacts

Adam Rochacewich
Polar Star Mining Corporation
Interim President and Chief Financial Officer
(416) 368-3496
Email: info@polarstarmining.com
Website: www.polarstarmining.com




November 09, 2009:
Polar Star provides update on Montezuma Property and Early Exercise of Warrants
October 13, 2009:
Polar Star: Talca Gold District exploration update
September 29, 2009:
Polar Star announces granting of options
May 27, 2009:
Polar Star Mining Announces First Quarter 2009 Results and Provides Development Update
May 21, 2009:
Polar Star Applies for Extension of NI 43-101 Technical Report Filing
April 20, 2009:
Polar Star Mining Corporation Elects New Board and Names New President
April 14, 2009:
Polar Star Issues Revised Press Release on Chepica
April 09, 2009:
Polar Star Cuts Significant Widths of Copper Mineralization in First Phase Drilling at Montezuma
April 07, 2009:
Polar Star Board Nominees Recommended by Leading Proxy Advisory Firm
April 07, 2009:
SRK Consulting (Chile) Releases NI 41-101 Technical Report on Chepica
April 03, 2009:
Polar Star Confirms Intended Composition of the Audit Committee
April 01, 2009:
Polar Star Completes Financing
March 06, 2009:
Polar Star Announces That Dissident Douglas Willock Has Rejected Company Compromise
February 27, 2009:
Polar Star Mining Corporation-Drilling Begins at Montezuma
February 23, 2009:
Polar Star Seeks Court Orders to Protect Shareholders from Dissident Abuse
February 19, 2009:
Polar Star Announces Closing of Financing
February 18, 2009:
Douglas Willock provides update to shareholders of Polar Star
February 17, 2009:
Polar Star Announces Date of Annual and Special Meeting of Shareholders
February 10, 2009:
Polar Star Accelerates Montezuma Drilling Program
February 06, 2009:
Polar Star Mining Corporation - Board to continue its orderly process towards shareholder meeting
January 30, 2009:
Management changes at Polar Star - Adam Rochacewich named Interim President
December 15, 2008:
Chépica Option Extension Terminated
November 27, 2008:
BTV-Business Television Features Polar Star Mining & North American Gem Plus Analyst John Embry
November 19, 2008:
Chepica Project Update
October 22, 2008:
3 Meters of 31.67 g/t Gold Plus 0.78% Copper at Chepica Mine
September 24, 2008:
Montezuma and Chepica Mine Update
August 25, 2008:
Polar Star Completes Non-Brokered Private Placement
August 12, 2008:
Polar Star Acquires Additional 5% Equity Interest in Chepica Mine
August 07, 2008:
Polar Star Appoints David G. Speck Vice-President, Corporate Development
July 16, 2008:
Polar Star Issues 250,000 Options
July 12, 2008:
Polar Star Takes on Chile! says Northern Miner Print Edition & Web TV of July 11
July 08, 2008:
Polar Star: 3.1 Meters of 13.55 g/t Au, 9.8 g/t Ag and 0.58% Cu at Chepica Mine
July 02, 2008:
Polar Star Mining Corporation-25,000 Metre Diamond Drill Contract
June 12, 2008:
Polar Star Announces $5,000,000 Financing
May 20, 2008:
Polar Star Appoints New CFO
May 13, 2008:
Polar Star - 44 Metres of 0.71% Cu at Los Azules
May 12, 2008:
Polar Star Mining Annual Shareholders Meeting May 13, 2008
April 10, 2008:
Polar Star Receives $975,000 From Warrants Exercised Early
April 09, 2008:
Polar Star Mining Assigns Rights in Todd Creek Property
March 25, 2008:
Polar Star Mining Corporation Terminates Sonia-Puma Option
February 27, 2008:
Polar Star Options Yoanca Property in Chile
January 15, 2008:
Polar Star Mining Corporation - Los Azules Drilling Program